FAO Online Catalogues

899 record(s) found - 600 record(s) presented (too general query)
See examples

Result pages:  1  2  3  4  5  6  7  8  9  10  [Next >>]
Latin America: San Gonzalo Channel Barrage and Merim Lagoon level control. Technical report. Draft final report. Part 2, drawings (English) Sir M. MacDonald and Partners, Consulting Engineers, London (United Kingdom) , 1970 LAT/REG/35. Development of the Merim Lagoon Basin (Brazil and Uruguay). Part 2 of 2. 9 large plans, 1 drwg.
Accession No: 114555, Report No: AGL-UNDP/SF LAT/REG/35 , Fiche No: 14555
Descriptors: DAMSDESIGN; HYDRAULIC STRUCTURES; CANALS
Document order

Mauritius: Land and Water Resources Survey, final report. Vol 4, geology and hydrogeology. Part 1, text. Chap. 9, geological and geophysical surveys of reservoir beds, dam sites tunnel and pumping schemes (English) Land and Water Development Div. , 1971 UNDP/SF report. 78/MAR/6. Vol 4 of 6, part 1 of 2, p. 86-121. 3 tab.
Accession No: 114564, Report No: AGL-UNDP/SF 78/MAR/6 , Job No: 97949 , Fiche No: 14564
Descriptors: PUMPINGDAMSWATER RESERVOIRSGEOPHYSICSGEOLOGYWATER MANAGEMENT
Geographic coverage: MAURITIUS
Document order

Nigeria: Soil and Water Resources Survey of the Sokoto Valley, final report. Vol 2, Talata Mafara development and feasibility report for first stage Bobo project. Part 2, drawings (English) Land and Water Development Div. , 1969 UNDP/SF report. 67/NIR/3. Vol 2 of 6, part 2 of 2. 3 large maps, 15 plans
Accession No: 114571, Report No: AGL-UNDP/SF 67/NIR/3 , Job No: 88545 , Fiche No: 14571
Descriptors: WATERSHED MANAGEMENTDESIGN; SOIL; CARTOGRAPHY; IRRIGATION; CANALS; DAMS; WATER DRILLING; CONSTRUCTION MATERIALS; HYDRAULIC STRUCTURES; DRAINAGE SYSTEMS; HYDRAULIC ENGINEERING; DRAINAGE; PUMPING; FLUID MECHANICS; HYDROLOGY; FLOODPLAINS; SOIL GENESIS; MAPS; SOKOTO RIVERRIMA RIVER
Document order

Nigeria: Soil and Water Resources Survey of the Sokoto Valley, final report. Vol 3, plan for development of the water resources. Part 1, text (English) Land and Water Development Div. , 1969 UNDP/SF report. 67/NIR/3. Vol 3 of 6, part 1 of 2, 286 p.. 80 tab., 2 maps, 3 app. with 12 tab.
Accession No: 114572, Report No: AGL-UNDP/SF 67/NIR/3 , Job No: 88545 , Fiche No: 14572
Descriptors: WATER RESOURCESRESOURCE MANAGEMENT; HYDROLOGY; WATERSHEDS; WATER REQUIREMENTS; WATER SUPPLY; WATER MANAGEMENT; ENGINEERING; WATER RESERVOIRS; WATER STORAGE; DAMS; FLOOD CONTROL; SITE FACTORS; GEOLOGY; CONSTRUCTION MATERIALS; SOIL SURVEYS; RECLAMATION; IRRIGATION; DRAINAGE SYSTEMS; RECLAIMED LAND; PUMPING; ESTIMATED COSTS; HYDRAULIC STRUCTURES; IRRIGATION EQUIPMENT; SOKOTO RIVER
Find records on:   Related analytics
Document order

Nigeria: Soil and Water Resources Survey of the Sokoto Valley, final report. Vol 3, plan for development of the water resources. Part 1, text. Reservoir sites (English) Land and Water Development Div. , 1969 UNDP/SF report. 67/NIR/3. Vol 3 of 6, part 1 of 2, p. 15-131. 48 tab.
Accession No: 114573, Report No: AGL-UNDP/SF 67/NIR/3 , Job No: 88545 , Fiche No: 14573
Descriptors: VALLEYSSITE FACTORSWATER RESERVOIRS; METEOROLOGY; HYDROLOGY; RUNOFF WATER; WATER REQUIREMENTS; WATER STORAGE; FLOODING; SILTING; STORAGE STRUCTURES; ENGINEERING; COSTS; GEOLOGY; CONSTRUCTION MATERIALS; DAMS; SOKOTO RIVER
Document order

Nigeria: Soil and Water Resources Survey of the Sokoto Valley, final report. Vol 3, plan for development of the water resources. Part 1, text. App. 1, bills of quantities and cost estimates for dams. App. 2, cost estimates for development areas and polder schemes. App. 3, technical descriptions and costs of pumping stations (English) Land and Water Development Div. , 1969 UNDP/SF report. 67/NIR/3. Vol 3 of 6, part 1 of 2, p. 213-278. 12 tab.
Accession No: 114575, Report No: AGL-UNDP/SF 67/NIR/3 , Job No: 88545 , Fiche No: 14575
Descriptors: WATER MANAGEMENTFINANCING; RECLAMATION; VALLEYS; ESTIMATED COSTS; ENGINEERING; DAMS; EMBANKMENTS; HYDRAULIC STRUCTURES; EQUIPMENT; LESS FAVOURED AREAS; RECLAIMED LAND; FLOOD CONTROL; IRRIGATION; DRAINAGE SYSTEMS; DESIGN; HYDRAULIC ENGINEERING; PUMPING
Document order

Nigeria: Soil and Water Resources Survey of the Sokoto Valley, final report. Vol 3, plan for development of the water resources. Part 2, drawings (English) Land and Water Development Div. , 1969 UNDP/SF report. 67/NIR/3. Vol 3 of 6, part 2 of 2. 5 large maps, 17 plans
Accession No: 114576, Report No: AGL-UNDP/SF 67/NIR/3 , Job No: 88545 , Fiche No: 14576
Descriptors: VALLEYSWATER RESOURCESRESOURCE MANAGEMENTDESIGN; HYDROLOGY; PRECIPITATION; RUNOFF WATER; WATERSHED MANAGEMENT; LESS FAVOURED AREAS; WATER MANAGEMENT; DAMS; HYDRAULIC STRUCTURES; STORAGE STRUCTURES; WATER RESERVOIRS; SOIL; CARTOGRAPHY; SOIL FERTILITY; IRRIGATION; RECLAIMED LAND; PUMPING; MAPS; SOKOTO RIVER
Document order

Kenya: drainage of the Yala Swamp and construction of Nzoia Irrigation Scheme (English) HEARNSHAW JJ,  , 1971 KEN/6. Surveys and Pilot Demonstration Schemes Leading to Reclamation of the Yala Swamp. Technical report no 1. 128 p.. 11 tab., 3 plans, 14 app. with 28 tab., 8 graphs, 4 plans & 1 large map attached & 1 large graph, 3 maps in folder
Accession No: 115741, Report No: AGL-UNDP/SF KEN/6 , Job No: B5978 , Fiche No: 15741
Descriptors: IRRIGATIONENGINEERINGSWAMPSDRAINAGE; TOPOGRAPHY; SOIL SURVEYS; CLIMATOLOGY; HYDROLOGY; FLOODING; DESIGN; IRRIGATION SYSTEMS; CANALS; PUMPING; DAMS; LAKES; MAPS; NZOIA RIVER
Geographic coverage: KENYA
Find records on:   Related analytics
Document order

Design of lakes Kanyaboli and Saru storage dykes and Lake Victoria protection dyke and continuation of the Yala River diversion canal (English) Land and Water Development Div. , 1971 KEN/6. Surveys and Pilot Demonstration Schemes Leading to Reclamation of the Yala Swamp. Technical report no 1. App. G, p. 117-127. 2 tab., 3 graphs. Kenya: drainage of the Yala Swamp and construction of Nzoia Irrigation Scheme
Accession No: 115744, Report No: AGL-UNDP/SF KEN/6 , Job No: B5978 , Fiche No: 15744
Descriptors: WATER STORAGEHYDRAULIC ENGINEERINGCANALSDAMSDESIGNENGINEERINGWATER MANAGEMENT; ; LAKE SARU; YALA RIVERLAKE KANYABOLI
Geographic coverage: LAKE VICTORIAKENYA
Document order

Iran: Groundwater resources organization and investigations 1965/1970: report to the government (English) DAVIS RS,  , 1971 30 p.. 2 tab., 2 maps, 1 app. & 1 large org. chart attached
Accession No: 116038, Document type: ORGANIZATION CHARTS , Report No: AGL-UNDP/TA 2989 , Job No: B9698 , Fiche No: 16038
Descriptors: RESEARCHWATER RESOURCESGROUNDWATER; RESEARCH PROJECTS; HYDROLOGY; DAMS
Geographic coverage: IRAN ISLAMIC REPUBLIC
FOR INTERNAL USE ONLY !

Recherches sur l'influence de l'assainissement des terres sur la flore et la vegetation dans l'enceinte endiguee Gostinu-Pietrele, dont le territoire de la station pilote FAO Baneasa-Giurgiu [Research on the influence of land reclamation on the vegetation and flora inside the dammed area of Gostinu-Pietrele, including the FAO pilot station of Baneasa Giurgiu]. (French) ALEXAN MION C,  , 1971 ROM/1. Establishment and Operation of Pilot Irrigation Stations in the Danube Plain. Rumania: Agronomy. Technical Report no 9. Annex 1, p. 169-174. 1 tab., 3 graphs
Accession No: 116213, Report No: AGL-UNDP/SF ROM/1 , Fiche No: 16213
Descriptors: DAMSVEGETATIONFLORARECLAMATIONRESEARCH PROJECTS; SOIL MANAGEMENT; WATER MANAGEMENT; BOTANY; ROMANIA
Document order

Mali: Amenagements [Mali: Managements]. (French) BRADEA SORSINI R(PM.)  , 1970 Societe Centrale pour l'Equipement du Territoire-Cooperation, Paris (France). MLI/2. Improvement and Expansion of Rice Cultivation. Improvement and expansion of rice culture in Mali. Technical Report. Vol 4 of 6, 143 p.. 9 tab., 1 graph, 3 plans, 10 ref., 1 annex with 11 tab. & 2 large graphs, 1 plan attached & 1 large map in folder
Accession No: 116591, Report No: AGS-UNDP/SF MLI/2 , Fiche No: 16591
Descriptors: PLANT PRODUCTIONRICEWATER MANAGEMENT; IRRIGATION SYSTEMS; DAMS; CANALS; DRAINAGE; HYDRAULIC STRUCTURES; SOIL SURVEYS; TOPOGRAPHY; FLUID MECHANICS; AGRONOMY; NOXIOUS ANIMALS; FISHES; RECLAMATION; ESTIMATED COSTS; FARM AREA; ARABLE SOILS
Document order

Liban: Planification hydraulique du Liban-Nord: etude geologique du site de barrage de Qarhaiya [Lebanon: Water planning of Northern Lebanon: study of Qarhaiya dam site geology]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 29 p.. 6 annexes & 2 large graphs, 4 plans, 3 maps in folder
Accession No: 116750, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16750
Descriptors: DAMSGEOLOGY; WATER DRILLING; GEOMORPHOLOGY; PERMEABILITY; CARTOGRAPHY
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: etude geologique du site de barrage de Bared centrale [Lebanon: Water planning of Northern Lebanon: study of central Bared dam site geology]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 11 p.. 1 large plan, 4 maps in folder
Accession No: 116753, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16753
Descriptors: DAMSGEOLOGY; PERMEABILITY; CARTOGRAPHY; BARED RIVER
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: etude geologique du site de barrage de Noura et Tahtaniye [Lebanon: Water planning of Northern Lebanon: study of Noura and Tahtaniye dam site geology]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 24 p.. 4 annexes & 2 large plans, 4 maps in folder
Accession No: 116754, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16754
Descriptors: DAMSGEOLOGY; WATER DRILLING; GEOMORPHOLOGY; PERMEABILITY; CARTOGRAPHY
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Qarhaiya (sur le Nahr el Moussa) [Lebanon: Water planning of Northern Lebanon: Qarhaiya dam (on the Nahr el Moussa)]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 102 p.. 18 tab., 1 graph, 2 plans, 4 maps, 1 large graph, 8 plans, 1 map in folder. Abstr. in E, F
Accession No: 116755, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16755
Descriptors: DAMSENGINEERING; HYDROGEOLOGY; DESIGN; CANALS; ESTIMATED COSTS; HYDRAULIC STRUCTURES; CONCRETE; VOLUME; MOUSSA RIVER
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Iaal [Lebanon: Water planning of Northern Lebanon: Iaal dam]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 74 p.. 18 tab., 6 graphs & 1 large map attached & 1 large graph, 7 plans, 1 map in folder
Accession No: 116756, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16756
Descriptors: CANALSDESIGNHYDROGEOLOGYDAMSENGINEERING; ESTIMATED COSTS; HYDRAULIC STRUCTURES; CONCRETE; VOLUME; IAAL RIVER
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage (Bared Centrale) [Lebanon: Water planning of Northern Lebanon: (Central Bared) dam]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 70 p.. 13 tab. & 1 large graph, 7 plans in folder
Accession No: 116757, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 16757
Descriptors: DAMSENGINEERING; HYDROGEOLOGY; DESIGN; CANALS; ESTIMATED COSTS; HYDRAULIC STRUCTURES; CONCRETE; VOLUME; BARED RIVER
Geographic coverage: LEBANON
Document order

Contributions a la connaissance du comportement des cultures de peupliers euramericains dans la zone digue-rive, en conditions d'inondations prolongees [Contributions to the knowledge of the behaviour of Canadian poplar crops in the dam-bank zone, in conditions of prolonged inundations]. (French) JURMA TRADU S,  , 1971 Sess. 14; International Poplar Commission, Bucarest (Romania), 27 Sep - 2 Oct 1971. 11 p.. 2 tab., 4 phot., 3 ref.. Abstr. in E, F, S
Accession No: 117838, Report No: FO-CIP/71/46 , Fiche No: 17838
Descriptors: FLOODINGDAMSPOPULUSBEHAVIOUR; WATER BALANCE; DANUBE RIVER; FOREST PLANTATIONS
Geographic coverage: ROMANIA
Document order

Amenagement et mise en valeur du Bassin du Fleuve Senegal: index no 1 [Management and reclamation of Senegal River Basin: index no 1]. (French) Centre de Documentation pour le Programme de Developpement du Bassin du Fleuve Senegal , 1972 383 p.
Accession No: 118400, Document type: BIBLIOGRAPHY , Report No: GIL , Job No: C4785 , Fiche No: 18400
Descriptors: WATERSHEDSRECLAMATIONWATER MANAGEMENTINFORMATION PROCESSING; WATER RESOURCES; WATER SUPPLY; WATER ANALYSIS; GEOGRAPHY; DAMS; SITE FACTORS; FLOODING; FLUID FLOW; GROUNDWATER TABLE; IRRIGATION; CLIMATOLOGY; GEOLOGY; HYDROLOGY; HYDROGRAPHY; HYDROGEOLOGY; SALINITY; SOIL MANAGEMENT; YIELDS; RESEARCH
Geographic coverage: MOROCCOSENEGAL RIVER
Document order

Yemen Arab Republic: Diversion structures (English) , 1971 Tesco/Viziterv/Vituki, Budapest (Hungary). YEM/1. Survey of the Agricultural Potential of the Wadi Zabid. Technical Report no 4. 134 p.. 13 tab., 1 map, 3 app. with 22 tab., 6 ref. & 16 large graphs, 25 plans, 13 maps in folder
Accession No: 118408, Report No: AGL-UNDP/SF YEM/1 , Fiche No: 18408
Descriptors: WATERSHEDSCANALSDAMS; HYDROGEOLOGY; INFILTRATION; SEDIMENT; DIMENSIONS; DRAINAGE SYSTEMS; HYDRAULIC STRUCTURES; ZABID RIVER
Geographic coverage: YEMEN
Document order

Yemen Arab Republic: Dam sites (English) , 1971 Tesco/Viziterv/Vituki, Budapest (Hungary). YEM/1. Survey of the Agricultural Potential of the Wadi Zabid. Technical Report no 5. 104 p.. 10 tab., 3 graphs, 1 map, 3 app. with 2 tab., 5 ref. & 7 large graphs, 8 plans, 5 maps in folder
Accession No: 118409, Report No: AGL-UNDP/SF YEM/1 , Fiche No: 18409
Descriptors: DAMSSITE FACTORS; HYDROGEOLOGY; SEDIMENT; GEOMORPHOLOGY; GEOPHYSICS; ROCK; HYDROLOGY; FLUID MECHANICS; INFILTRATION; HYDRAULIC STRUCTURES; ESTIMATED COSTS; ZABID RIVER
Geographic coverage: YEMEN
Document order

Yemen Arab Republic: Survey of the agricultural potential of the Wadi Zabid: final report (English) , 1971 Tesco/Viziterv/Vituki, Budapest (Hungary). YEM/1. Survey of the Agricultural Potential of the Wadi Zabid. 129 p.. 14 tab., 1 map, 4 app. & 11 large graphs, 2 plans, 6 maps in folder
Accession No: 118418, Report No: AGL-UNDP/SF YEM/1 , Fiche No: 18418
Descriptors: WATERSHEDSAGRICULTURE; CARTOGRAPHY; TOPOGRAPHY; HYDROLOGY; HYDROGEOLOGY; SOIL SURVEYS; LAND CLASSIFICATION; LAND SUITABILITY; HYDRAULIC ENGINEERING; IRRIGATION; WATER RESOURCES; DRAINAGE; AGRICULTURAL DEVELOPMENT; INVESTMENT; COST BENEFIT ANALYSIS; IRRIGATION SYSTEMS; RUNOFF WATER; DESIGN; IRRIGATED LAND; DAMS; ZABID RIVER
Geographic coverage: YEMEN
FOR INTERNAL USE ONLY !

Zambia: The fisheries of the Kafue River flats, Zambia, in relation to the Kafue Gorge Dam (English) KAPETSKY JMLAGLER KFSTEWART DJ,  , 1971 University of Michigan, Ann Arbor, Michigan (USA). ZAM/11. Central Fisheries Research Institute, Chilanga. Technical Report no 1. 173 p.. 15 tab., 1 graph, 10 phot., 1 flow chart, 1 plan, 4 maps, 11 annexes with 31 tab., 3 graphs, 1 phot., 22 ref.
Accession No: 118567, Report No: FI-UNDP/SF ZAM/11 , Fiche No: 18567
Descriptors: DAMSCOASTAL SOILSFISHERIES; ANIMAL POPULATION; FISHERY MANAGEMENT; FISHING METHODS; FISHING OPERATIONS; WATER RESERVOIRS; FORECASTING; YIELDS; FISHES; STOCKS; FISHERY BIOLOGY; FLOODING; KAFUE RIVER
Geographic coverage: ZAMBIA
Document order

Syria: Construction of dykes and strengthening of river banks on the Euphrates: terminal report (English, French, Spanish) World Food Programme , 1972 Sess. 21; Intergovernmental Committee of the World Food Programme, Rome (Italy), 24 Apr - 3 May 1972. 4 p.. 1 tab.
Accession No: 119139, Report No: WFP-IGC/21/10 ADD. 19 , Job No: C6560 , Fiche No: 19139
Descriptors: FOOD AIDCOSTSRIVERSDAMSENGINEERING; WATER MANAGEMENT
Geographic coverage: SYRIAEUPHRATES RIVER
Document order

Iraq: Stability tests in checkdams (English) GULCUR M,  , 1972 Forest Research Institute, Arbil (Iraq). IRQ/18. Forestry Research, Demonstration and Training, Arbil. Report no RD 31; Range Management Pamphlet no 7. 35 p.. 5 tab., 9 drwgs, 8 ref.
Accession No: 119891, Report No: FO-UNDP/SF IRQ/18 , Fiche No: 19891
Descriptors: MATHEMATICSDAMSTESTING; METHODS; WATER MANAGEMENT; ENGINEERING
Geographic coverage: IRAQ
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Qarqaf (sur Ouadi el Haour) [Lebanon: Hydraulic planning of Northern Lebanon: Qarqaf dam (on Ouadi el Haour)]. (French) Land and Water Development Div. , 1972 LEB/13. Hydro-Agricultural Development. 87 p.. 22 tab., 1 map, 1 plan, abstr. in E, F & 8 large plans, 1 graph, 1 map in folder
Accession No: 120068, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 20068
Descriptors: DAMSWATER SUPPLYFLUID MECHANICSPLANNING; TOPOGRAPHY; GEOLOGY; HYDROLOGY; DESIGN; HYDRAULIC STRUCTURES; ESTIMATED COSTS; CONCRETE; VOLUME; HAOUR RIVER
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Noura et Tahta (sur Nahr el Kebir) [Lebanon: Hydraulic planning of Northern Lebanon: Noura and Tahta dams (on Nahr el Kebir)]. (French) Land and Water Development Div. , 1972 LEB/13. Hydro-Agricultural Development. 76 p.. 16 tab., 1 graph, 2 maps, abstr. in E, F & 1 large plan attached & 5 large plans, 1 graph, 1 map in folder
Accession No: 120069, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 20069
Descriptors: DAMSWATER SUPPLYFLUID MECHANICSPLANNING; TOPOGRAPHY; GEOLOGY; HYDROLOGY; DESIGN; HYDRAULIC STRUCTURES; ESTIMATED COSTS; CONCRETE; VOLUME; KEBIR RIVER
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Ilat (sur Nahr el Aarqa) [Lebanon: Hydraulic of Northern Lebanon: Ilat dam (on Nahr el Aarqua)]. (French) Land and Water Development Div. , 1972 LEB/13. Hydro-Agricultural Development. 45 p.. 14 tab., 1 graph, abstr. in E, F & 4 large plans in folder
Accession No: 120070, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 20070
Descriptors: DAMSWATER SUPPLYFLUID MECHANICSPLANNING; TOPOGRAPHY; GEOLOGY; HYDROLOGY; DESIGN; HYDRAULIC STRUCTURES; ESTIMATED COSTS; CONCRETE; VOLUME
Geographic coverage: LEBANON
Document order

Liban: Planification hydraulique du Liban-Nord: Barrage de Kfar Harra (sur Nahr Ostouene) [Lebanon: Hydraulic planning of Northern Lebanon: Kfar Harra dam (on Nahr Ostouene)]. (French) Land and Water Development Div. , 1972 LEB/13. Hydro-Agricultural Development. 94 p.. 40 tab., 2 graphs, 1 plan, 1 map, abstr. in E, F & 1 large tab. attached & 7 large plans, 1 map, 1 graph in folder
Accession No: 120071, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 20071
Descriptors: DAMSWATER SUPPLYFLUID MECHANICSPLANNING; TOPOGRAPHY; GEOLOGY; HYDROLOGY; DESIGN; HYDRAULIC STRUCTURES; ESTIMATED COSTS; CONCRETE; VOLUME; OSTOUANE RIVER
Geographic coverage: LEBANON
Document order

Liban: Irrigation du perimetre de Koura-Zgharta a partir du barrage de Dar Beachtar: avant-projets du reseau pour differentes superficies. A, rapport; B, details estimatifs; C, pieces dessinees [Lebanon: Irrigation of Koura-Zgharta perimeter from Dar Beachtar: network preliminary projects for various areas. A, report; B, estimative details; C, design drawings]. (French) Land and Water Development Div. , 1971 LEB/13. Hydro-Agricultural Development. 7 separates
Accession No: 120075, Report No: AGL-UNDP/SF LEB/13 , Fiche No: 20075
Descriptors: DAMSIRRIGATIONIRRIGATION SYSTEMS; WATER MANAGEMENT
Geographic coverage: LEBANON
Find records on:   Related analytics
Document order

ArgentinaL Informe final del sector ingenieria en irrigacion. Vol 2, recomendaciones sobre el diseno y operacion de las obras que integran el complejo Chocon-Cerros Colorados [Argentina: Final report of the irrigation engineering sector. Vol 2, recommendations on the design and operation of the integrative works of the Chocon-Cerros Colorados system]. (Spanish) FERNANDEZ PCHERNANDEZ FN,  , 1969 ARG/20. Feasibility Study for the Development of the Comahue Region. Vol 2 of 4, 48 p.. 18 tab., 1 graph & 9 large tab., 5 graphs attached
Accession No: 120321, Report No: ESE-UNDP/SF ARG/20 , Fiche No: 20321
Descriptors: WATER STORAGEHYDRAULIC ENGINEERINGDESIGN; DAMS; STORAGE STRUCTURES; IRRIGATION; WATER UPTAKE; ENERGY GENERATION; FLOODING; FORECASTING; DRAINAGE SYSTEMS; FLOOD CONTROL
Document order

Ivory Coast: Kossou Dam resettlement. Interim evaluation report (English, French, Spanish) World Food Programme , 1972 FAO, Twenty-Second Session; Intergovernmental Committee of the World Food Programme, Rome (Italy), 23-27 Oct 1972. 8 p.
Accession No: 120808, Report No: WFP-IGC 22/10 ADD.29 , Job No: D2118 , Fiche No: 20808
Descriptors: FOOD AIDCOSTSRURAL SETTLEMENTDAMS; AGRICULTURAL DEVELOPMENT
Geographic coverage: COTE D'IVOIRE
Document order

Iran: the Jaje Rud diversion system (Varamin plain) (English) BOS MGVOJSIC S,  , 1970 Tehran (Iran). IRA/12. Integrated Planning of Irrigated Agriculture in the Varamin and Garmsar Plains. 25 p.. plans, maps
Accession No: 121050, Report No: AGL-UNDP/SF IRA/12 , Fiche No: 21050
Descriptors: DAMS; DESIGN; ENGINEERING; CANALS; IRRIGATION; WATER SUPPLY; HYDRAULIC STRUCTURES; ESTIMATED COSTS; EMBANKMENTS; JAJE RIVER
Geographic coverage: IRAN ISLAMIC REPUBLIC
Document order

Greece: irrigation works for the Messara, general study and cost estimates (English) HEKKET HOOSTERKAMP JL,  , 1970 Iraklion (Greece). GRE/17. Study of Water Resources and their Exploitation for Irrigation in Eastern Crete. Technical Note No 15. Provisional document. 116 p.. Tab., drwgs, graphs, plans, maps, app.
Accession No: 122098, Report No: AGL-UNDP/SF GRE/17 , Fiche No: 22098
Descriptors: IRRIGATION SYSTEMSESTIMATED COSTS; WATER USE; GROUNDWATER; SURFACE WATER; WATER RESOURCES; IRRIGATION; DESIGN; HYDRAULIC STRUCTURES; WATER RESERVOIRS; DAMS; PUMPING; OPERATING COSTS; WATER SUPPLY; SPRINKLER IRRIGATION; PIPES
Geographic coverage: GREECE
Document order

Mauritius: La Nicoliere Reservoir enlargement. Geophysical examination of proposed new dam sites (English) SENTENAC R,  , 1968 (Reduit) (Mauritius). MAR/2. Land and Water Resources Survey, 1968. 7 p.. Plan, graph, map
Accession No: 123344, Report No: AGL-UNDP/SF MAR/2 , Fiche No: 23344
Descriptors: ELECTRICAL CONDUCTIVITYSOILDAMSSITE FACTORSGEOPHYSICS; SOIL SURVEYS; HYDROLOGY; MAPS
Geographic coverage: MAURITIUS
Document order

Site investigations and surveys (English) Engineering & Power Development Consultants, Sidcup (United Kingdom) , 1970 Sidcup, Kent (UK), Engineering & Power Development Consultants. SWA/2. Survey and Planning of the Usutu River Basin. Mapobeni Irrigation Scheme, technical and economic feasibility, App. 1. 63 p.. Tab., graphs. 3 ref.
Accession No: 123349, Report No: AGL-UNDP/SF SWA/2 , Fiche No: 23349
Descriptors: SOIL SURVEYSSITE FACTORS; HYDRAULIC ENGINEERING; GEOLOGY; DAMS; SOIL ANALYSIS; IRRIGATION; SOIL TYPES; MAPS
Document order

Engineering studies (English) Engineering & Power Development Consultants, Sidcup (United Kingdom) , 1970 Sidcup, Kent (UK), Engineering & Power Development Consultants. SWA/2. Survey and Planning of the Usutu River Basin. Mapobeni Irrigation Scheme, technical and economic feasibility, App. 3. 66 p.. Tab.
Accession No: 123351, Report No: AGL-UNDP/SF SWA/2 , Fiche No: 23351
Descriptors: HYDRAULIC ENGINEERING; WATER STORAGE; SITE FACTORS; COST ANALYSIS; ENGINEERING; DAMS; DRAINAGE SYSTEMS; PLANNING; IRRIGATION SYSTEMS; FARMS; INFRASTRUCTURE; MAPS
Document order

Swaziland: Usutu, Mbuluzi, Komati and Lomati river basins. General plan. Technical annex 1, physiology, geology climatology and hydrology (English) Engineering & Power Development Consultants, Sidcup (United Kingdom) , 1970 Sidcup, Kent (UK), Engineering & Power Development Consultants. SWA/2. Survey and Planning of the Usutu River Basin. 193 p.. Tab., graphs maps
Accession No: 123355, Report No: AGL-UNDP/SF SWA/2 , Fiche No: 23355
Descriptors: WATERSHEDSHYDROLOGYCLIMATOLOGYGEOLOGY; PRECIPITATION; EVAPORATION; RIVERS; FLOW RATE; SEDIMENTATION; FOREST ECOLOGY; IRRIGATION; WATER REQUIREMENTS; DEMAND; WATER STORAGE; DAMS; WATER RESERVOIRS; WATER BALANCE; LOMATI RIVERKOMATI RIVERMBULUZI RIVER
Document order

Swaziland: Usutu, Mbuluzi, Komati and Lomati river basins. General plan. Technical annex 5, engineering (English) Engineering & Power Development Consultants, Sidcup (United Kingdom) , 1970 Sidcup, Kent (UK), Engineering & Power Development Consultants. SWA/2. Survey and Planning of the Usutu River Basin. 241 p.. Tab., graphs plans, maps, flow chart
Accession No: 123360, Report No: AGL-UNDP/SF SWA/2 , Fiche No: 23360
Descriptors: WATERSHED MANAGEMENTENGINEERING; HYDRAULIC ENGINEERING; WATER MANAGEMENT; FLOOD CONTROL; WATER STORAGE; SITE FACTORS; ESTIMATED COSTS; DAMS; IRRIGATION SYSTEMS; DESIGN; WATER RESERVOIRS; PUMPING; LOMATI RIVERKOMATI RIVERMBULUZI RIVER
Geographic coverage: SWAZILAND
Document order

Chypre: etude d'emplacements de barrages dans les regions de Paphos, Limassol et Morphou. Rapport de mission, fev 1969 [Cyprus: dam site investigations in Paphos, Limassol and Morphou regions]. (French) BARBIER RBARGE JL HERITEAU G,  , 1969 Nicosia (Cyprus). CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization, 1969. 39 p.. Tab. & 5 large plans in folder
Accession No: 123365, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23365
Descriptors: ENGINEERINGDAMSSITE FACTORS; HYDRAULIC ENGINEERING; GEOLOGY; TOPOGRAPHY
Geographic coverage: CYPRUS
Document order

Cyprus: report on the inspection of dam sites in the Larnaca, Paphos & Morphou areas, 15-25 Jun 1971 (English) Howard Humphreys & Sons, Epsom, United Kingdom Pietrangeli & Humphreys , 1971 Epsom (UK), Howard Humphreys & Sons/Pietrangeli Humphreys. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. 23 p.. Tab.
Accession No: 123366, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23366
Descriptors: DAMS; SITE FACTORS; ENGINEERING; GEOLOGY; CONSTRUCTION MATERIALS; HYDRAULIC ENGINEERING
Geographic coverage: CYPRUS
Document order

Cyprus: report on the inspection of dam sites in the Larnaca, Paphos & Morphou areas, 28 Sep - 12 Oct 1971 (English) Howard Humphreys & Sons, Reading, United Kingdom Pietrangeli & Humphreys , 1971 Reading (UK), Howard Humphreys & Sons/Pietrangeli & Humphreys. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. 21 p.
Accession No: 123367, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23367
Descriptors: DAMS; SITE FACTORS; ENGINEERING; GEOLOGY; CONSTRUCTION MATERIALS; HYDRAULIC ENGINEERING
Geographic coverage: CYPRUS
Document order

Cyprus: report on the inspection of dam sites in the Larnaca, Paphos & Morphou areas, 3-16 May 1972 (English) Howard Humphreys & Sons, Reading, United Kingdom Pietrangeli & Humphreys , 1972 Reading (UK), Howard Humphreys & Sons/Pietrangeli & Humphreys. CYP/66/506. Surveys, Demonstration and Planning of Water Resources Utilization. 20 p.
Accession No: 123368, Report No: AGL-DP/CYP/66/506 , Fiche No: 23368
Descriptors: DAMS; SITE FACTORS; ENGINEERING; CONSTRUCTION MATERIALS; HYDRAULIC ENGINEERING
Geographic coverage: CYPRUS
Document order

Cyprus: Kourris river: Khalassa dam project. Head work and main irrigation canal. Preliminary study (English) Land and Water Development Div. , 1970 Nicosia (Cyprus). CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization, 1970. 53 p.. Tab. & 13 large plans in folder
Accession No: 123369, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23369
Descriptors: DAMS; COST ANALYSIS; HYDRAULIC ENGINEERING; ENGINEERING; IRRIGATION; CANALS; DESIGN
Geographic coverage: CYPRUS
Document order

Cyprus: engineering studies. Draft (English) LIPKO RJVAN WISSEN G,  , 1970 Nicosia (Cyprus). CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization, 1970. Technical Report No 5. 272 p.. Tab., graphs, plans, maps, app. & 3 large plans
Accession No: 123371, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23371
Descriptors: WATER RESOURCESPLANNINGHYDRAULIC ENGINEERING; WATER STORAGE; WATER RESERVOIRS; SITE FACTORS; DAMS; ENGINEERING; HYDROLOGY; GEOLOGY; SEDIMENTATION; DESIGN; COST ANALYSIS; RESOURCE MANAGEMENT; CANALS
Geographic coverage: CYPRUS
Document order

Cyprus: water control and management studies. Paphos irrigation project, final report. Vol 3, engineering annex (English) T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) , 1970 Vancouver (Canada), T. Ingledow & Associates Limited, Consulting Engineers. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. 211 p.. Tab., graphs, plans, maps
Accession No: 123379, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23379
Descriptors: WATER MANAGEMENTHYDRAULIC ENGINEERING; HYDROLOGY; FLOODING; WATER RESERVOIRS; SEDIMENTATION; SITE FACTORS; DAMS; ESTIMATED COSTS; ENGINEERING; DESIGN; HYDRAULIC STRUCTURES
Document order

Cyprus: water control and management studies. Paphos irrigation project, final report. Vol 4, geology annex (English) T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) , 1970 Vancouver (Canada), T. Ingledow & Associates Limited, Consulting Engineers. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. 88 p.. Tab., plans, maps
Accession No: 123380, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23380
Descriptors: DAMSGEOLOGY; ROCK; CANALS; DESIGN; HYDRAULIC STRUCTURES
Document order

Cyprus: water control and management studies. Paphos irrigation project, final report. Vol 5, hydrogeology annex (English) T. Ingledow & Associates Limited, Consulting Engineers, Vancouver (Canada) , 1970 Vancouver (Canada), T. Ingledow & Associates Limited, Consulting Engineers. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. 2 separates. Separate 1, 236 P., tab., plans, graph, maps, 19 ref.; Separate 2, 16 large maps, 22 plans in folder
Accession No: 123381, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23381
Descriptors: HYDROGEOLOGY; STRATIGRAPHY; GROUNDWATER TABLE; WATER SUPPLY; WATER QUALITY; GROUNDWATER; DAMS; ENGINEERING; WATER USE; WATER RESOURCES; WATER DRILLING; STORAGE STRUCTURES; ELECTRICAL CONDUCTIVITY; COASTAL PLAINS; WELLS
Document order

Cyprus: Paphos irrigation project. Quarterly report (English) Sir M. Macdonald and Partners, Consulting Engineers, London (United Kingdom) , 1971 London (UK), Sir M. Macdonald and Partners, Consulting Engineers. CYP/6. Surveys, Demonstration and Planning of Water Resources Utilization. Quarterly Report No 1. 37 p.. Graphs & 5 large maps in folder
Accession No: 123383, Report No: AGL-UNDP/SF CYP/6 , Fiche No: 23383
Descriptors: DEVELOPMENT PROJECTSIRRIGATION; PLANNING; FORECASTING; YIELDS; PRICES; CITRUS FRUITS; GRAPES; HYDROLOGY; WATER RESERVOIRS; FLUID FLOW; MEASUREMENT; DAMS; HYDRAULIC ENGINEERING; GROUNDWATER
Geographic coverage: CYPRUS
Document order

Result pages:  1  2  3  4  5  6  7  8  9  10  [Next >>]